back |
production of electricity |
technical specifications |
Click onto the pictures to enlarge.
29th May 2006: Start of the installation. The backward roof... |
and the forward roof before installation. |
The scaffold is installed. |
The construction site. |
|
boxes with roof hooks |
rail pieces... puzzle? ;) |
Installation of roof hooks at the backward roof. |
32 pieces |
after installation. |
The vertical rails are mounted. |
View from the roof. |
The under construction at the backward roof is finished. |
from nearby. |
close-up view of the screw connections . |
Screws + clamps made of V2A, the rails of aluminium. |
The roof hooks are being installed at the fore roof. |
Here the modules have to be lifted 5°. |
30 hooks for 12 modules. |
Am Abend des 29.05. schaut es auf dem vorderen Dach so aus. |
Am Morgen des 30.05. treffen die Module ein. |
Die Kabel werden verlegt. |
Leider ist das Wetter wechselhaft. |
Viel Kabel. |
Das hintere Dach ist verkabelt. |
Und weg. |
Hier kann man die Anständerung gut sehen. |
Das vordere Dach fertig verkabelt. |
Noch liegen die Kabelenden auf dem Dach. |
Durch dieses Loch verschwinden sie... |
...und kommen beim Wechselrichter wieder zum Voraschein, |
Nochmal die Unterkonstruktion auf dem vorderen Dach. |
Die ersten Module liegen auf ihrem Platz. |
Verschraubung |
|
The forward module array is finished. |
The forward modules are installed completely. |
The forward roof. |
The backward roof. (The SAT-Antenna is approx. 40cm deeper now) |
Evening. |
Looking from the Upjeversche Street.