back

production of electricity

technical specifications

Click onto the pictures to enlarge.

29th May 2006: Start of the installation. The backward roof...

and the forward roof before installation.

The scaffold is installed.

The construction site.

boxes with roof hooks

rail pieces... puzzle? ;)

Installation of roof hooks at the backward roof.

32 pieces

after installation.

The vertical rails are mounted.

View from the roof.

The under construction at the backward roof is finished.

from nearby.

close-up view of the screw connections .

Screws + clamps made of V2A, the rails of aluminium.

The roof hooks are being installed at the fore roof.

Here the modules have to be lifted 5°.

30 hooks for 12 modules.

Am Abend des 29.05. schaut es auf dem vorderen Dach so aus.

nach Oben

Am Morgen des 30.05. treffen die Module ein.

Die Kabel werden verlegt.

Leider ist das Wetter wechselhaft.

Viel Kabel.

Das hintere Dach ist verkabelt.

Und weg.

Hier kann man die Anständerung gut sehen.

Das vordere Dach fertig verkabelt.

Noch liegen die Kabelenden auf dem Dach.

Durch dieses Loch verschwinden sie...

...und kommen beim Wechselrichter wieder zum Voraschein,

Nochmal die Unterkonstruktion auf dem vorderen Dach.

Die ersten Module liegen auf ihrem Platz.

Verschraubung

The forward module array is finished.

The forward modules are installed completely.

The forward roof.

The backward roof. (The SAT-Antenna is approx. 40cm deeper now)

Evening.

Top

Looking from the Upjeversche Street.

Diese Seite auf Deutsch: